Requirements for supporting equipment for the construction of concrete wet spray robot
1. Workbench: According to the size of the tunnel section, a workbench with a bench length of 4m (one working cycle length) is manufactured on site.
2. Loading platform: Set the loading platform to facilitate the direct loading of concrete trucks.
3. Mixing material mixer: Compulsory concrete mixer, mixing building equipped with automatic metering, batching equipment, etc.
4. Water supply equipment: ensure that the water pressure is 0.15MPa~0.2MPa, which is convenient for flushing and maintenance.
5. Slump cylinder: 10×10 compression standard mold, impermeable mold, spray large plate bottom mold and other auxiliary tools.
Contact Person: Mr. Steve Wan
Tel: +86 18703811581
Fax: 86-371-6783-6231