Concrete pump-KBS-15D Hydraulic Wet Shotcrete Pump failure treatment
Item:
Concrete pipe blocking
Cause Analysis:
1. The concrete ratio does not meet the requirements for pumping concrete.
2. The conveying pipeline has not been cleaned for a long time, causing blocks in the pipe
3. The downtime is too long during the spraying process, causing concrete solidify in the pipe
Troubleshooting method:
1. The material should be prepared in strict accordance with the requirements of pumping concrete
2. Clean the conveying pipe with high-pressure water in time
3. When downtime exceeds half an hour, the machine should be booted for positive pump and reverse pump several times to prevent the concrete from solidifying
Contact Person: Mr. Steve Wan
Tel: +86 18703811581
Fax: 86-371-6783-6231