Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Henan Coal Science Research Institute Keming Mechanical and Electrical Equipment Co. , Ltd.
Home News

Concrete mixing---KJW pan mixer operation and precautions

China Henan Coal Science Research Institute Keming Mechanical and Electrical Equipment Co. , Ltd. certification
China Henan Coal Science Research Institute Keming Mechanical and Electrical Equipment Co. , Ltd. certification
I'm Online Chat Now
Company News
Concrete mixing---KJW pan mixer operation and precautions
Latest company news about Concrete mixing---KJW pan mixer operation and precautions

Operation and maintenance procedures and safety precautions
1. Check whether the connection of the electrical part is correct and good, and whether the shell of the electrical box is firmly grounded.
2. During operation, check whether the operation part is operating normally at any time, and immediately shut down to debug if there is any abnormal condition happens.
3. All transmission parts should be filled with grease, and the hybrid wheel should be removed and refueled every six months. The lubricating oil of the reducer should be replaced once a year.
4. Before starting, check whether the rotating part and the drum are scratched. If there is scratching, it should be adjusted in time.

Pub Time : 2023-05-09 16:23:29 >> News list
Contact Details
Henan Coal Science Research Institute Keming Mechanical and Electrical Equipment Co. , Ltd.

Contact Person: Mr. Steve Wan

Tel: +86 18703811581

Fax: 86-371-6783-6231

Send your inquiry directly to us (0 / 3000)