Installation and empty running test
1. After the whole machine arrives, check whether the accessories and technical documents are complete according to the packing list, and check whether there is missing or damage in the machine or any parts.
2. The user lays a good foundation according to the foundation drawing of the purchased product.
3. According to the installation position of the foundation drawing, make each mechanism in a horizontal state. The supporting foundation should be a firm and flat concrete floor.
4. After the whole machine is in place, check whether each transmission part is flexible and whether the bolts of each connection part are loose.